History
The New York Public Service Commission adopted plans for what was known as the Broadway–Lexington Avenue route on December 31, 1907. This route began at the Battery and ran under Greenwich Street, Vesey Street, Broadway to Ninth Street, private property to Irving Place, and Irving Place and Lexington Avenue to the Harlem River. After crossing under the Harlem River into the Bronx, the route split at Park Avenue and 138th Street, with one branch continuing north to and along Jerome Avenue to Woodlawn Cemetery, and the other heading east and northeast along 138th Street, Southern Boulevard, and Westchester Avenue to Pelham Bay Park. In early 1908, the Tri-borough plan was formed, combining this route, the under-construction Centre Street Loop Subway in Manhattan and Fourth Avenue Subway in Brooklyn, a Canal Street Subway from the Fourth Avenue Subway via the Manhattan Bridge to the Hudson River, and several other lines in Brooklyn.
The Brooklyn Rapid Transit Company submitted a proposal to the Commission, dated March 2, 1911, to operate the Tri-borough system (but under Church Street instead of Greenwich Street), as well as a branch along Broadway, Seventh Avenue, and 59th Street from Ninth Street north and east to the Queensboro Bridge; the Canal Street Subway was to merge with the Broadway Line instead of continuing to the Hudson River. The city, the BRT, and the Interborough Rapid Transit Company (which operated the first subway and four elevated lines in Manhattan) came to an agreement, and sent a report to the Board of Estimate on June 5, 1911. The line along Broadway to 59th Street was assigned to the BRT, while the IRT obtained the Lexington Avenue line, connecting with its existing route at Grand Central – 42nd Street. Construction began on Lexington Avenue on July 31, and on Broadway the next year. The Dual Contracts, two operating contracts between the city and the BMT and IRT, were adopted on March 4, 1913.
Because of the complicated history, the Broadway Line includes several remnants of earlier plans. The line was built as four tracks south to City Hall, where the local tracks were to end at the upper level, and the express tracks were to use the lower level, curving through Vesey Street into Church Street. However, the final plan had the express tracks splitting at Canal Street and passing under the northbound local track to the Manhattan Bridge. The tunnel south of City Hall was rebuilt to bring the upper local tracks down to the lower level north of Vesey Street, and the lower level at City Hall was never used for passenger service.
Unused construction is also present near the west end of the Queensboro Bridge. The original plan there was to build two one-track tunnels under 59th and 60th Streets, rising onto the bridge to Queens. However, plans were changed in 1915 to place both tracks under 60th Street and cross the East River in the 60th Street Tunnel, in part due to heavy vehicular traffic over the bridge. A piece of the 59th Street tunnel had already been built, concurrent with the construction of the IRT Lexington Avenue Line, and became a walkway connecting the two side platforms of the IRT's 59th Street station.
Another unused provision existed for many years north of 57th Street, where the two express tracks ended before being connected to the BMT 63rd Street Line in 1989. Plans were made, but never carried through, to build a line northwest through Central Park and under Eighth Avenue through the Upper West Side to Inwood, along the route later built as the IND Eighth Avenue Line.
A short portion of the line, coming off the north side of the Manhattan Bridge through Canal Street to 14th Street – Union Square, opened on September 4, 1917. An extension north to Times Square – 42nd Street and south to Rector Street was completed on January 5, 1918. Further portions were opened south to Whitehall Street – South Ferry on September 20, 1918, north to 57th Street on July 10, 1919, and east to Lexington Avenue / 59th Street on September 1, 1919. Both East River tunnels - the 60th Street Tunnel to Queensboro Plaza and the Montague Street Tunnel to DeKalb Avenue - opened on August 1, 1920, completing the Broadway Line.
Read more about this topic: BMT Broadway Line
Famous quotes containing the word history:
“It takes a great deal of history to produce a little literature.”
—Henry James (18431916)
“No matter how vital experience might be while you lived it, no sooner was it ended and dead than it became as lifeless as the piles of dry dust in a school history book.”
—Ellen Glasgow (18741945)
“... all big changes in human history have been arrived at slowly and through many compromises.”
—Eleanor Roosevelt (18841962)