Cost
The capital costs of implementing BRT lines can be lower than up-front costs of constructing LRT lines. A study by the United States Government Accountability Office found that the average capital cost per mile for busways was $13.5 million while light rail average costs were $34.8 million. However, a huge range of capital costs can be seen, as BRT lines can cost anywhere from $200,000—$55 million per mile, while LRT lines can range from $12.4—$118.8 million per mile. The total investment varies considerably due to factors such as cost of the roadway, station structures, park-and-ride facilities, traffic signal systems and vehicles.
The costs of a running a BRT system is about $13.49 a mile and the total cost for a year of expenditure is $987.80 according to a study done by the GAO. Running a BRT system is much less expensive than running a light rail system. The BRT is also much less expensive than a trolley system.
Read more about this topic: Bus Rapid Transit
Famous quotes containing the word cost:
“It is not enough for theory to describe and analyse, it must itself be an event in the universe it describes. In order to do this theory must partake of and become the acceleration of this logic. It must tear itself from all referents and take pride only in the future. Theory must operate on time at the cost of a deliberate distortion of present reality.”
—Jean Baudrillard (b. 1929)
“Keeping accounts, Sir, is of no use when a man is spending his own money, and has nobody to whom he is to account. You wont eat less beef today, because you have written down what it cost yesterday.”
—Samuel Johnson (17091784)
“To call a posit a posit is not to patronize it. A posit can be unavoidable except at the cost of other no less artificial expedients. Everything to which we concede existence is a posit from the standpoint of a description of the theory-building process, and simultaneously real from the standpoint of the theory that is being built.”
—Willard Van Orman Quine (b. 1908)