Description
The Ohio-class submarines were designed specifically for extended war-deterrence patrols. Each of these submarines is provided with two complete crews, called the Blue crew and the Gold crew, with each crew serving typically on 70- to 90-day deterrent patrols. To decrease the time in port for crew turnover and replenishment, three large logistics hatches have been installed to provide large-diameter resupply and repair access. These hatches allow rapid transfer of supply pallets, equipment replacement modules, and machinery components, significantly reducing the time required for replenishment and maintenance of the submarines.
The class's design allows the warship to operate for about fifteen years between major overhauls. These submarines are reported to be as quiet at their cruising speed of 20 knots (37 km/h; 23 mph) or more than the previous Lafayette-class submarines were at 6 knots (11 km/h; 6.9 mph), although exact information remains classified. Fire control for their Mark 48 torpedoes is carried out by Mark 118 Mod 2 system, while the Missile Fire Control (MFC) system is a Mark 98.
The Ohio-class submarines were constructed from sections of hull, with each four-deck section being 42 ft (13 m) in diameter. The sections were produced at General Dynamics Electric Boat's Quonset Point, Rhode Island facility, and then assembled at their Groton, Connecticut shipyard.
The US Navy has a total of 18 Ohio-class submarines which consist of
- 14 SSBNs (fleet ballistic missile submarines (FBM)), each armed with up to 24 Trident II submarine-launched ballistic missiles (SLBM); they are also known as "Trident" submarines, and provide the sea-based leg of the nuclear triad of the US strategic nuclear weapons arsenal
- Four SSGNs (cruise missile submarines), each capable of carrying 154 Tomahawk cruise missiles with either conventional or nuclear warheads, plus a complement of Harpoon missiles to be fired through their torpedo tubes.
Read more about this topic: Ohio-class Submarine
Famous quotes containing the word description:
“Everything to which we concede existence is a posit from the standpoint of a description of the theory-building process, and simultaneously real from the standpoint of the theory that is being built. Nor let us look down on the standpoint of the theory as make-believe; for we can never do better than occupy the standpoint of some theory or other, the best we can muster at the time.”
—Willard Van Orman Quine (b. 1908)
“As they are not seen on their way down the streams, it is thought by fishermen that they never return, but waste away and die, clinging to rocks and stumps of trees for an indefinite period; a tragic feature in the scenery of the river bottoms worthy to be remembered with Shakespeares description of the sea-floor.”
—Henry David Thoreau (18171862)
“He hath achieved a maid
That paragons description and wild fame;
One that excels the quirks of blazoning pens.”
—William Shakespeare (15641616)