Transport In Gabon
Until the 1970s, Gabon had no railroads. A 936 km railroad construction program, the Trans-Gabon Railway, began in October 1974. In its first stage, completed in 1983, the project linked the port of Owendo with the interior city of Booué (332 km). The second stage, completed in December 1986, linked Booué with Franceville (357 km) via Moanda, thus facilitating exports of manganese from the southeast and forestry exploitation in the same region. A proposed third stage would continue the line from Booué to Belinga in the northeast, where there are iron ore deposits.
In 2003 the railway began the process of installing a satellite based telecommunications system. As of 2004, Gabon State Railways totalled 814 km of standard-gauge track.
total: 814 km (Gabon State Railways or OCTRA)
standard gauge: 814 km 1.435-m gauge; single track (1994)
Read more about Transport In Gabon: Road Transport, Air Transport, Pipelines
Famous quotes containing the word transport:
“One may disavow and disclaim vices that surprise us, and whereto our passions transport us; but those which by long habits are rooted in a strong and ... powerful will are not subject to contradiction. Repentance is but a denying of our will, and an opposition of our fantasies.”
—Michel de Montaigne (15331592)