Transport in Sudan - Pipelines

Pipelines

refined products 815 km

By the early 1970s, operational problems on the Port Sudan-Khartoum section of Sudan Railways had resulted in inadequate supplies of petroleum products reaching Khartoum and other parts of the country. In 1975 construction of an oil pipeline from the port to Khartoum was begun to relieve traffic pressure on the railroad. It was completed in mid-1976, but leaks were discovered and the 815-kilometer-long pipeline, laid generally parallel to the railroad, did not become operational until September 1977. As constructed, its capacity was 600,000 tons a year, but that throughput was only attained in mid-1981. In early 1982, steps were taken to add additional booster pumping stations to increase the rate to an annual throughput capacity of 1 million tons. The line carried only refined products, including gasoline, gas oil, kerosene, and aviation fuel obtained either from the refinery at the port or from import-holding facilities there. These fuels were moved in a continuous operation to storage tanks at Khartoum with some capacity offloaded at Atbarah. Rail tank cars released by the pipeline were reassigned to increase supplies of petroleum products in the western and southwestern regions of the country.

Read more about this topic:  Transport In Sudan