Work Breakdown Structure

Work Breakdown Structure

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.

A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

Read more about Work Breakdown Structure:  Overview, History, Example, Misconceptions

Famous quotes containing the words work, breakdown and/or structure:

    The Battle of Waterloo is a work of art with tension and drama with its unceasing change from hope to fear and back again, change which suddenly dissolves into a moment of extreme catastrophe, a model tragedy because the fate of Europe was determined within this individual fate.
    Stefan Zweig (18811942)

    With the breakdown of the traditional institutions which convey values, more of the burdens and responsibility for transmitting values fall upon parental shoulders, and it is getting harder all the time both to embody the virtues we hope to teach our children and to find for ourselves the ideals and values that will give our own lives purpose and direction.
    Neil Kurshan (20th century)

    The philosopher believes that the value of his philosophy lies in its totality, in its structure: posterity discovers it in the stones with which he built and with which other structures are subsequently built that are frequently better—and so, in the fact that that structure can be demolished and yet still possess value as material.
    Friedrich Nietzsche (1844–1900)